A productive 10 days; have been busy with the waterfront buildings along with chores of every day life. I have assembled and finished 2 piers with 3 buildings all Micro-Train laser cut structures and will admit to being impressed with the quality of product they offer. My only hope is that my modeling skills are up to snuff.
Here is the shore side of the warehouse and canning plant
Here is a from the water view showing all 3 structures
Heres a good picture of the 3 builds & 2 piers
Have also finished a Micro-Trains Freight House, its being a little camera shy though.
Construction has started on the GC Laser Ice House and Icing Platform.
Almost time to order the 2 American style 3 stall roundhouses by Nansen Street.
I did have time to stop at the local home center and picked up the materials for the base; 4' x 8' x 1/2" OSB, a 2" x 3", an arm full of 1" x 3"s and 2 4' x 8' sheets of foam; 1 1" & 1 1/2". Also a bottle of wood glue, 2 tubes of painters latex caulk, a box of drywall screws and a pair of folding table legs.
Now just a matter of putting it all together, I do prefer to start with a level base and work up.
I'm thinking that's about it, so until next time......
No comments:
Post a Comment